Create and track project tasks

Assign tasks, track progress and use List, Kanban or Gantt views.

In this guide

Open Tasks, then New task to organise work. Leave a task unassigned, assign several people or choose a team. List, Kanban and Gantt views display the same tasks in different ways.

Before you start

A project must already exist. Create the people or teams you want to assign, and check that your role allows task management. Read-only access does not allow creation or editing.

Use a specific title such as “Prepare the delivery area”. Explain the location, instructions and expected result in the description.

Steps

  1. Open Tasks, then New task.
  2. Select the Project and enter the Title. Both are required.
  3. Complete the Description, Priority and Status.
  4. Add a Planned start and Due date if needed. The due date cannot precede the start. You can also choose a project Work package.
  5. Under Assignment, choose Unassigned, One or more people or A team, then select the recipients.
  6. Check Notify on WhatsApp and click Create task.

A task assigned to several people remains one task with a shared status. A team assignment includes its current members; it does not create a separate task per person.

Open the task to edit it and click Save. A new assignment may offer a notification. A text correction alone should not be treated as another automatic notification.

Check the result

Check the assignees, project and dates in the list. Kanban helps track status. Gantt uses the planned start or, if absent, the due date. Undated tasks remain accessible in the list.

If a notification fails, check whether the task was saved before retrying. The error may affect WhatsApp only. Notifications shows the available recent deliveries.

Import an Excel spreadsheet

Choose Import from Excel in task actions. Save the spreadsheet as CSV, with a header row, a titre or title column and at least one task.

Choose the default project, upload the file and review the preview before importing. Use Export CSV to download existing tasks.

For missing assignees, check Users & teams. Use Scheduling to plan on-site attendance alongside task tracking.